Volume | Meeting |
---|---|
What are the 4 ways you would measure your success in a business?
Safety, Cost, Volume, Culture
|
What does SIS measure?
System Implementation Schedule - used to score and measure the maturity of SafeTons processes - Meetings and MAP
|
What are the 3 ways you can increase volume?
Reduce unplanned downtime, optimize planned downtime and eliminate bottlenecks
|
What is a TOR?
Terms of Reference - used as a tool for the EC process and in meetings
|
What are 2 things you check on a Handoff?
SWP completed, hazards discussed, check of equipment, clean work space
|
|
What are the 4 areas covered on the Balanced Scorecard?
Safety, Cost, Volume, Culture
|
|