Site work | How much is it? | Ecology | Stormwater | Plants |
---|---|---|---|---|
What is grading plan
A plan that shows proposed contours
|
What is a PCC
This abbreviation is an estimate of the development cost
|
What is a corrdor
Connects hubs
|
What is first flush
The most polluted part of runoff
|
What is a forb
This is a general name for some wildflowers
|
What is design development
The phasing the design process.
|
What is SY
Concrete is costed in this unit
|
What is an ecotone
This is where two distinct plant alliances overlap
|
What is bioswale
Soil augmented broad based "ditch"
|
What is a legume
Redbud belongs to this group of plants
|
What is RCP
Abbreviation for culvert made of concrete
|
What is LF
The abbreviation for lineal foot
|
What is a sink
General term for nutrient accumulation
|
What is Hortons flow
Name of shallow groundwater fliw
|
What is on center
Distance specification or note for planting plants
|
What is upturned (end) drain
Drain modification to create anerobic zone in bioretention
|
What is contingency
Am amount for unexpected costs
|
What is adsorption
When particulates stick to substrate, for example sediment binding to living plant tissue
|
What is Water treatment volume
Runoff amount from the first 1.2 inches is called this
|
What is ambrosia beatle
Dont spec Maples in some areas because of the pest
|
What is a sediment and erosion control plan
This plan tells contractor where to place temporary seeding
|
What is the design fee
An approximate percentage for most of the soft costs.
|
What is denitrification
What happens when nitrogen is treated in stormwater wetland
|
What is 6 min
Least amount of time that TR 55 allows for flow to accumulate
|
What is green side up
Directions to crew placing sod
|