Remove and Replace
What does action taken code (R) mean?
|
7- O level
6- I level
How many programs are managed by QA for O-level and I-level
|
ALBERT BERRY
WHO WAS THE FIRST PERSON TO SUCCESSFULLY JUMP OUT OF AN AIRCRAFT WITH A PARACHUTE?
|
NA 13-1-6.3-2
WHAT IS THE PUBLICATION FOR THE SKU-10/A?
|
LESS THAN ONE MINUTE
HOW LONG SHALL THE LIFERAFT INFLATE TO THE DESIGN SHAPE IN DURING THE FUNCTIONAL TEST FOR SKU-10?
|
EMERGENCY ESCAPE BREATHING DEVICE
WHAT DOES EEBD STAND FOR?
|
180 SQUARE INCHES
WHEN REPAIRING COVERALLS THE TOTAL PATCHED AREA SHALL NOT EXCEED_____ SQUARE INCHES
|
ISSC- IN SERVICE SUPPORT CENTER
MEDP- MATERIAL ENGINEERING DISPOSITION PROGRAM
CHP 12 NAMP
|
NAMSOPS
CHP. 10 NAMP?
|
HAS REMAINED EMPTY FOR MORE THAN 2 HOURS
YOU MUST PURGE THE EMERGENCY O2 SYTEMS WHEN THE SYSTEM MEETS WHICH OF THE FOLLOWING CRITERIA?
|
6 FOLDS
HOW MANY TOTAL FOLDS SHOULD THERE BE ON THE CANOPY WHEN STUFFING FOR THE NB-6 PARACHUTE?
|
301
WHAT IS THE U.S. STANDARD LOCK STITCH?
|
13-1-6.4-1
OXYGEN SYSTEMS PUBLICATION?
|
13-1-6.1-1
LIFRAFT PUBLICATION?
|
FACING UP
ON A/P28S-32 PARACHUTES THE KNURLS ON THE CONNECTOR LINKS SHOULD BE FACING WHAT WAY??
|
27 Ib
THE FINAL PULL TEST FOR THE RIPCORD ON AN NB-6 SHOULD BE HOW MANY PUNDS?
|
MOLDED FIBERGLASS
WHAT MATERIAL IS THE SEAT LID OF THE SKU-10/A CONSTRUCTED OF?
|
8 YEARS FROM MANUFACTURE
5 YEARS PLACE IN SERVICE
EXPIRATION FOR LOWER OXYGEN HOSES?
EXPIRATION FOR PLACED IN SERVICE AND EXPIRATION FROM DATE OF MANUFACTURED. |
TENSILE STRENGTH
FOR FABRICATION PURPOSES,, WHAT NAME IS GIVEN TO THE FORCE REQUIRED TO BREAK MATERIAL?
|
6 INCHES
DURING A WATER LEAK TEST FOR COVERALLS THE SLEEVE IS SUPPOSED TO BE FILLED WITH WATER _____ INCHES FROM SLEEVE OPENING
|
23 TO 27 DROPS
WHAT IS THE RANGE OF THE PRESSURE REDUCER TEST ON A 115V MOTOR VALVE TEST?? ____ TO ____ DROPS..
|
NAMP Compliance Auditing
NAMDRP Technical Data Management Maintenance Dept. Safety SE Misuse/ Abuse aircraft Confined Space Program (O-Level) Vibration Analysis
What are the 7 programs managed by QA?
|
20 TO 25 IN-lb
TORQUE VALUE ON CONNECTOR LINKS FOR A/P28S-32 PARACHUTES? ____ to ____IN-lb..
|
482 F
MELTING POINT OF NYLON MATERIAL?
|
3 PSI
1 MINUTE
THE INITIAL READING FOR LEAK CHECK ON OBOGGS CANNOT DROP _____ PSI UNDER _____ MINUTE(S)
|