Driver/ Pump & Aerial Ops Strategic and tactical considerations on the Fireground Leave HAZARDOUS MATERIALS RESPONSE COMMUNICATIONS
100
Ammeter
This gauge indicates the amount of current being drawn from the battery to operate the electrical equipment or the amount of current being supplied to the battery to charge it.
100
Pre incident planning
Method of gathering facts about a building or process prior to an emergency
100
1500
All leave requests need to be entered and audited in TeleStaff by _____ the day before the requested leave
100
ICS
Any incident that involves a hazardous material spill or release is the responsibility of the Virginia Beach Fire Department. VBFD personnel shall establish an
100
“MAYDAY, MAYDAY, MAYDAY”
An urgent message that a person is in an emergency situation shall be announced on the radio as _______ followed by the unit designation, then a brief and concise statement of essential information(ASLIP)
200
Pounds per square inch per 100 ft of hose
Friction loss is USUALLY expressed in terms of:
200
Unified Command
Using multiple agencies to have one command plan
200
0630
You have till this time to enter sick leave
200
3. Level 1 – An incident limited in scope and potential effects
Level 2 – An emergency situation that is larger in scope and more severe in terms of actual or potential effects than a Level I incident.
Level 3 – Disaster
How many Incident classifications are there
DOUBLE JEOPARDY
200
Telephones and Mobile Data Computers (MDC)
The preferred method for communicating non-emergency radio traffic
300
Water Supply Officer
This person would be responsible to coordinate the water supply operation.
300
Hot and warm zone
Red tape and yellow tape are used to indicate what on the fireground
300
1600
Personnel wishing to sign up for a callback must enter their name into TeleStaff by ____ on the day before they wish to work.
300
Exclusion Zone
The area around a hazardous materials site will vary in size and shape depending upon the
size of the release, chemical properties and health hazards of the material released, weather, topography, type of site, etc.
300
Responder taking subject into custody: A situation in which a responder wishes to alert a partner, other responders,or dispatcher that the intention is to take
a subject into custody and resistance is anticipated.
Signal 3 means
400
Standpipe & Sprinkler
Name the 2 types of operations that require the pump operator to start off at 150 psi
400
Specific, Measurable, Action-orientated, Realistic, timely
S.M.A.R.T. acronym stands for
DOUBLE JEOPARDY
400
Doctors statement
Supervisors may, at any time, regardless of the amount of sick leave taken, request that the employee present a ______ to forward to the employee's Battalion Chief.
400
50 ft from the edge
How far from the Hot Zone is the Warm zone?
400
ORION - The system is designed to provide an alternate radio system for large-scale disasters characterized by the engagement of resources from multiple jurisdictions or resources engaged across numerous jurisdictional lines.
Hampton Roads has an emergency management communications system known as
500
33.8
Theoretically, the maximum distance a pump can lift water @ sea level is _____ feet.
500
Rescue
Exposures
Confinement
Extinguishment
Overhaul
Ventilation
Salvage
RECEO-VS acronym stands for
500
Hours NOT worked (leave without pay)
ALL hours recorded as tardy or AWOL shall be recorded in TeleStaff as
500
3
Level A, B, C, or D protective clothing can be utilized and shall be donned by at least ____ personnel
500
Alpha India Quebec Yankee
Bravo Juliet Romeo Zulu
Charlie Kilo Sierra
Delta Lima Tango
Echo Mike Uniform
Foxtrot November Victor
Golf Oscar Whiskey
Hotel Papa X-ray
What is the phonetic alphabet






SOP Jeopardy

Press F11 for full screen mode



Limited time offer: Membership 25% off


Clone | Edit | Download / Play Offline